2009-12-22-cfd-engines  (29 Slides)     [Page 1 of 1]  
   

December 22, 2009 - Cary FD - New Engines

Return to Main Page


  2009-12-22-cfd-engines-01-mjl  
  2009-12-22-cfd-engines-02-mjl  
  2009-12-22-cfd-engines-03-mjl  
  2009-12-22-cfd-engines-04-mjl  
  2009-12-22-cfd-engines-05-mjl  
  2009-12-22-cfd-engines-06-mjl  
  2009-12-22-cfd-engines-07-mjl  
  2009-12-22-cfd-engines-08-mjl  
  2009-12-22-cfd-engines-09-mjl  
  2009-12-22-cfd-engines-10-mjl  
  2009-12-22-cfd-engines-11-mjl  
  2009-12-22-cfd-engines-12-mjl  
  2009-12-22-cfd-engines-13-mjl  
  2009-12-22-cfd-engines-14-mjl  
  2009-12-22-cfd-engines-15-mjl  
  2009-12-22-cfd-engines-16-mjl  
  2009-12-22-cfd-engines-17-mjl  
  2009-12-22-cfd-engines-18-mjl  
  2009-12-22-cfd-engines-19-mjl  
  2009-12-22-cfd-engines-20-mjl  
  2009-12-22-cfd-engines-21-mjl  
  2009-12-22-cfd-engines-22-mjl  
  2009-12-22-cfd-engines-23-mjl  
  2009-12-22-cfd-engines-24-mjl  
  2009-12-22-cfd-engines-27-mjl  
  2009-12-22-cfd-engines-28-edit-mjl  
  2009-12-22-cfd-engines-25-mjl  
  2009-12-22-cfd-engines-26-mjl  
  2009-12-22-cfd-engines-29-mjl  

CARY - Two 2009 Pierce Velocity pumpers at Station 7, delivered the day before. Each with 1,500 GPM Waterous, single-stage pump; 500-gallon water tank; Husky 12 foam system with 30-gallon Class A and 25-gallon Class B foam cells; Detroit Series 60, 515 HP engine; Allison 6 speed transmission; TAK-4 suspension; front and side air bags; seat-belt monitoring system; Harrison 8 KW hydraulic generator; Whelen light package; LED compartment lighting; backboard compartment on hose bed cover; lights on hose bed cover; through-the-tank ladder storage; speedlays, the first for Cary pumpers. Expected in service in late January. "C" shift. Mike Legeros photographs.


Album last updated on 12/22/09 8:22 PM
Powered by Jalbum 8.3 and BluPlusPlus skin