{"id":1012,"date":"2017-06-22T15:00:55","date_gmt":"2017-06-22T19:00:55","guid":{"rendered":"http:\/\/legeros.com\/blog\/?p=1012"},"modified":"2017-06-23T20:10:05","modified_gmt":"2017-06-24T00:10:05","slug":"renovations-coming-to-raleigh-fire-station-2","status":"publish","type":"post","link":"https:\/\/legeros.com\/blog\/renovations-coming-to-raleigh-fire-station-2\/","title":{"rendered":"Updated &#8211; Renovations for Raleigh Fire Station 2"},"content":{"rendered":"<p>June 22, 2017<br \/>Renovations are well underway. The interior has been gutted. New walls, windows, wiring, plumbing, HVAC, and fixtures are being installed. The adjoining &#8220;shop space,&#8221; the old repair shop, is being re-purposed as a drive-through apparatus bay and additional living space.<\/p>\n<p>Work should be completed in November.\u00a0<\/p>\n<p>Engine 2 relocated to their temporary quarters on November 30, and marked in service just after midnight on December 1, 2017. They&#8217;re housed at the old city sign, signals, and radio shop, at the corner of Blount and Wilmington Streets.<\/p>\n<p>Construction started in December.\u00a0<a href=\"http:\/\/www.legeros.com\/ralwake\/photos\/2017-rfd-station2-renovations\">See more photos<\/a>.\u00a0<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-2334\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2017-06-22-rfd.jpg\" alt=\"2017-06-22-rfd\" width=\"600\" height=\"400\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2017-06-22-rfd.jpg 600w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2017-06-22-rfd-300x200.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>November 26<br \/> Work is nearly complete on temporary quarters for Engine 2.\u00a0They&#8217;ll relocate to the old city radio\/signals\/signs shop at the corner of Wilmington and City Farm. They&#8217;ll occupy a mobile home that&#8217;s been installed on the site. The engine will be housed in the shop&#8217;s single bay, and the haz-mat apparatus and equipment will be stored in the adjoining storage building. See more photos or click to enlarge:<\/p>\n<p><a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-26-rfd.jpg\"> <img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1503\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-26-rfda.jpg\" alt=\"2016-11-26-rfda\" width=\"600\" height=\"149\" border=\"1\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-26-rfda.jpg 600w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-26-rfda-300x75.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p>July 14<br \/> Construction bids are being received this week for renovations of Raleigh Fire Station 2 at 263 Pecan Road. The project is the second in a multi-year plan for \u201cdown to the walls\u201d renovations of older fire stations not slated for replacement or relocation. Renovations to Station 5 at 300 Oberlin Road\u2013first on the list\u2013are currently underway, with Engine 5 temporarily housed at Station 6. (See <a href=\"http:\/\/legeros.com\/blog\/details-on-renovations-of-fire-station-5\/\">blog post<\/a>#1 and <a href=\"http:\/\/legeros.com\/blog\/raleigh-fire-station-5-temporarily-closing-for-renovations\/\">blog post<\/a> #2.)<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1013\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd1.jpg\" sizes=\"(max-width: 600px) 100vw, 600px\" srcset=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd1.jpg 600w, http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd1-300x159.jpg 300w\" alt=\"2016-07-13-rfd1\" width=\"600\" height=\"318\" \/><\/p>\n<p>Though similar in design to many of the city\u2019s older engine houses, Station 2 is an atypical facility as it adjoins the former maintenance shop. The latter was relocated to 4120 New Bern Avenue in 2004, to a new Services Support Center built beside the city\u2019s heavy equipment depot. The old shop space was re-purposed into an extension of the fire station, and presently houses Haz-Mat 2, the foam trailer, haz-mat supplies, and exercise equipment.<\/p>\n<p><!--more--><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1014\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd3.jpg\" sizes=\"(max-width: 600px) 100vw, 600px\" srcset=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd3.jpg 600w, http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd3-300x208.jpg 300w\" alt=\"2016-07-13-rfd3\" width=\"600\" height=\"416\" \/><\/p>\n<p>Renovations are planned to start in September. The engine company will be relocated to the old city radio shop, at the corner of Wilmington and <del>Hoke<\/del> City Farm. The building has a single-bay that can house the engine, and the haz-mat apparatus will be stored next door, at the old city bus depot. (Meaning, Haz-Mat 1, the spill support unit and former rescue truck Haz-Mat 4, and the aforementioned foam trailer.)<\/p>\n<p><span id=\"more-1012\"><\/span>As designed by Davis Kane Architects, the renovated station will combine the separate spaces. The apparatus bay will be extended and become drive-through. Rooms will be added on either side of the bay, in the rear, including an exercise room and dormitory space. Here\u2019s an annotated copy of the floor plan. <strong>Click to enlarge:<\/strong><\/p>\n<p><a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-14-rfd5.jpg\"><img decoding=\"async\" class=\"alignnone size-full wp-image-1015\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-14-rfd5.jpg\" sizes=\"(max-width: 1200px) 100vw, 1200px\" srcset=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-14-rfd5.jpg 1200w, http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-14-rfd5-300x279.jpg 300w, http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-14-rfd5-1024x951.jpg 1024w, http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-14-rfd5-730x678.jpg 730w\" alt=\"2016-07-14-rfd5\" width=\"600\" \/><\/a><\/p>\n<p><strong>Historical Perspective<\/strong><\/p>\n<p>Station 2 opened on Pecan Street on October 16, 1969. It\u2019s the fourth location for Engine 2. The original Station 2 was housed in the old Rescue Company quarters on Fayetteville Street. Built in 1870, it opened as a career fire station on December 1912, with Hose Company 2. The two-story building was replaced in 1914. That year, a new Station 2 was opened at 412 South Salisbury Street. The old building was demolished, after the county reclaimed the site for a new courthouse.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1016\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd2.jpg\" sizes=\"(max-width: 599px) 100vw, 599px\" srcset=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd2.jpg 599w, http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd2-300x125.jpg 300w\" alt=\"2016-07-13-rfd2\" width=\"599\" height=\"249\" \/><\/p>\n<p>The fire station was relocated again in 1932, into the basement of the newly completed Memorial Auditorium. The two-bay fire station included space for a maintenance shop. (And the rear exterior of the building was designed for use as a training tower, and served as the department\u2019s drill pad.) Engine 2 operated at that location until 1941, when Station 1 moved into old Station 2 on Salisbury Street.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1017\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd4.jpg\" sizes=\"(max-width: 596px) 100vw, 596px\" srcset=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd4.jpg 596w, http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-07-13-rfd4-300x156.jpg 300w\" alt=\"2016-07-13-rfd4\" width=\"596\" height=\"309\" \/><\/p>\n<p>Since neither the aerial ladder nor service ladder truck companies could fit into the Salisbury Street fire station, they were both moved to the fire station at Memorial. Engine 2 was moved back to Salisbury Street, and Station 1 was a \u201cdouble house\u201d for most of the decade. (It\u2019s also my supposition that two engines at \u201cCentral Fire Station\u201d proved useful enough that it was replicated when the new Station 1 opened on Dawson Street in 1953 and Engine 9 was activated.)<\/p>\n<p>Here\u2019s a quick chart:<\/p>\n<table border=\"1\" cellspacing=\"0\" cellpadding=\"3\">\n<tbody>\n<tr>\n<td>\ufffd<\/td>\n<td>Sta 1<\/td>\n<td>Sta 2<\/td>\n<td>Sta 6<\/td>\n<\/tr>\n<tr>\n<td>1941-49<\/td>\n<td>E1, E2<\/td>\n<td>Aerial Ladder, <br \/> Service Ladder<\/td>\n<td>\ufffd<\/td>\n<\/tr>\n<tr>\n<td>1949-53<\/td>\n<td>E1<\/td>\n<td>E2, Aerial Ladder<\/td>\n<td>Service Ladder<\/td>\n<\/tr>\n<tr>\n<td>1953+<\/td>\n<td>E1, new E9,<br \/> Aerial Ladder<\/td>\n<td>E2<\/td>\n<td>Service Ladder<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Bonus History!<\/strong><\/p>\n<p>Also in the mix was the \u201csquad\u201d or auxiliary truck. Basically, this was a mini-pumper that was staffed with two firemen. Activated in 1944, maybe parked inside alarm house? Maybe parked outside a fire station? Believe moved to Station 1 in 1949. Believe moved to Station 2 in 1953. Later housed at Station 1, by 1958. Later housed at Station 7, by 1960. Later housed at Station 6, by 1962. Removed from service after 1963.<\/p>\n<p><img decoding=\"async\" src=\"http:\/\/legeros.com\/ralwake\/gallery\/apparatus\/ral-1948-ford.jpg\" \/><\/p>\n<p><strong>Learn More<\/strong><\/p>\n<p>For more history, see:<\/p>\n<ul>\n<li>Raleigh Fire Company Histories \u2013 <a href=\"http:\/\/legeros.com\/ralwake\/raleigh\/history\/data\/company-histories.pdf\">Document<\/a> (PDF)<\/li>\n<li>Raleigh Fire Station Histories \u2013 <a href=\"http:\/\/legeros.com\/ralwake\/raleigh\/stations\/2.shtml\">Station 2<\/a><\/li>\n<li>Blog post \u2013 <a href=\"http:\/\/legeros.com\/blog\/remembering-the-fire-station-at-memorial-auditorium\/\">Remembering the Fire Station at Memorial Auditorium<\/a><\/li>\n<li>Blog post \u2013 <a href=\"http:\/\/legeros.com\/ralwake\/photos\/weblog\/pivot\/entry.php?id=1207\">Mysteries of Station 2<\/a><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=dKj41hZRTv4\">Film footage from 1950<\/a><\/li>\n<\/ul>\n<div data-animation=\"no-animation\" data-icons-animation=\"no-animation\" data-overlay=\"on\" data-change-size=\"\" data-button-size=\"0.7\" style=\"font-size:0.7em!important;display:none;\" class=\"supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-content supsystic-social-sharing-content-align-left\" data-text=\"\"><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter facebook\" target=\"_blank\" title=\"Facebook\" href=\"http:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Flegeros.com%2Fblog%2Frenovations-coming-to-raleigh-fire-station-2%2F\" data-main-href=\"http:\/\/www.facebook.com\/sharer.php?u={url}\" data-nid=\"1\" data-name=\"\" data-pid=\"1\" data-post-id=\"1012\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Updated - Renovations for Raleigh Fire Station 2\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-facebook\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter twitter\" target=\"_blank\" title=\"Twitter\" href=\"https:\/\/twitter.com\/share?url=https%3A%2F%2Flegeros.com%2Fblog%2Frenovations-coming-to-raleigh-fire-station-2%2F&text=Updated+%26%238211%3B+Renovations+for+Raleigh+Fire+Station+2\" data-main-href=\"https:\/\/twitter.com\/share?url={url}&text={title}\" data-nid=\"2\" data-name=\"\" data-pid=\"1\" data-post-id=\"1012\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Updated - Renovations for Raleigh Fire Station 2\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-twitter\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter pinterest\" target=\"_blank\" title=\"Pinterest\" href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url=https%3A%2F%2Flegeros.com%2Fblog%2Frenovations-coming-to-raleigh-fire-station-2%2F&description=Updated+%26%238211%3B+Renovations+for+Raleigh+Fire+Station+2\" data-main-href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url={url}&description={title}\" data-nid=\"7\" data-name=\"\" data-pid=\"1\" data-post-id=\"1012\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Updated - Renovations for Raleigh Fire Station 2\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-pinterest\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>June 22, 2017Renovations are well underway. The interior has been gutted. New walls, windows, wiring, plumbing, HVAC, and fixtures are being installed. The adjoining &#8220;shop space,&#8221; the old repair shop, is being re-purposed as a drive-through apparatus bay and additional living space. Work should be completed in November.\u00a0 Engine 2 relocated to their temporary quarters &#8230;<\/p>\n<p><a href=\"https:\/\/legeros.com\/blog\/renovations-coming-to-raleigh-fire-station-2\/\" class=\"more-link\">Continue reading &lsquo;Updated &#8211; Renovations for Raleigh Fire Station 2&rsquo; &raquo;<\/a><\/p>\n<div data-animation=\"no-animation\" data-icons-animation=\"no-animation\" data-overlay=\"on\" data-change-size=\"\" data-button-size=\"0.7\" style=\"font-size:0.7em!important;display:none;\" class=\"supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-content supsystic-social-sharing-content-align-left\" data-text=\"\"><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter facebook\" target=\"_blank\" title=\"Facebook\" href=\"http:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Flegeros.com%2Fblog%2Frenovations-coming-to-raleigh-fire-station-2%2F\" data-main-href=\"http:\/\/www.facebook.com\/sharer.php?u={url}\" data-nid=\"1\" data-name=\"\" data-pid=\"1\" data-post-id=\"1012\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Updated - Renovations for Raleigh Fire Station 2\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-facebook\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter twitter\" target=\"_blank\" title=\"Twitter\" href=\"https:\/\/twitter.com\/share?url=https%3A%2F%2Flegeros.com%2Fblog%2Frenovations-coming-to-raleigh-fire-station-2%2F&text=Updated+%26%238211%3B+Renovations+for+Raleigh+Fire+Station+2\" data-main-href=\"https:\/\/twitter.com\/share?url={url}&text={title}\" data-nid=\"2\" data-name=\"\" data-pid=\"1\" data-post-id=\"1012\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Updated - Renovations for Raleigh Fire Station 2\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-twitter\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter pinterest\" target=\"_blank\" title=\"Pinterest\" href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url=https%3A%2F%2Flegeros.com%2Fblog%2Frenovations-coming-to-raleigh-fire-station-2%2F&description=Updated+%26%238211%3B+Renovations+for+Raleigh+Fire+Station+2\" data-main-href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url={url}&description={title}\" data-nid=\"7\" data-name=\"\" data-pid=\"1\" data-post-id=\"1012\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Updated - Renovations for Raleigh Fire Station 2\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-pinterest\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><\/div>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,9],"tags":[],"_links":{"self":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts\/1012"}],"collection":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/comments?post=1012"}],"version-history":[{"count":15,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts\/1012\/revisions"}],"predecessor-version":[{"id":2340,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts\/1012\/revisions\/2340"}],"wp:attachment":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/media?parent=1012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/categories?post=1012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/tags?post=1012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}