{"id":1092,"date":"2021-07-08T07:00:16","date_gmt":"2021-07-08T11:00:16","guid":{"rendered":"http:\/\/legeros.com\/blog\/?p=1092"},"modified":"2022-02-26T13:32:51","modified_gmt":"2022-02-26T18:32:51","slug":"relocating-fire-station-14","status":"publish","type":"post","link":"https:\/\/legeros.com\/blog\/relocating-fire-station-14\/","title":{"rendered":"Relocating Fire Station 14 &#8211; Now in Service"},"content":{"rendered":"<p><em>This is an ongoing blog posting about the relocating of Fire Station 14.\u00a0<\/em><\/p>\n<p>See Legeros updates below. See also ongoing\u00a0<a href=\"https:\/\/legeros.smugmug.com\/Facility-Projects\/RFD-Sta-14\">Legeros photos<\/a>. And here\u2019s the\u00a0<a href=\"https:\/\/www.raleighnc.gov\/home\/content\/PublicWorks\/Articles\/FireStation14.html\">official project site<\/a>\u00a0from the city.<\/p>\n<p><strong>Contents<\/strong><\/p>\n<ul>\n<li>7\/8\/21 &#8211; Now in Service<\/li>\n<li>4\/16\/21 &#8211; Construction Nearly Completion<\/li>\n<li>8\/10\/19 &#8211; Walls Going Up<\/li>\n<li>6\/25\/19 &#8211; Site Work Nearly Finished<\/li>\n<li>3\/23\/19 &#8211; Site Work Finishing<\/li>\n<li>7\/25\/18 &#8211; Site Work Started<\/li>\n<li>1\/17\/17 &#8211; Construction Bid Awarded<\/li>\n<li>12\/28\/17 &#8211; Site Cleared<\/li>\n<li>11\/9\/16 &#8211; Second Public Meeting<\/li>\n<li>8\/15\/16 &#8211; Drawings and Floor Plan<\/li>\n<li>8\/6\/16 &#8211; Public Meeting<\/li>\n<\/ul>\n<p>July 8, 2021<br \/>\nNew Station 14 opened on July 7, 2021. It was activated at 6:17 p.m.\u00a0<\/p>\n<p>Squad 14, Ladder 14 from Station 17, and Battalion 3 moved into their new quarters that day. Units and personnel moved their PPE and work equipment, along with personal belongings. IT staff relocated computers and communications equipment. Some other things, such as exercise equipment, would be transferred later.\u00a0<\/p>\n<p>In addition to Squad 14, Ladder 14, and Battalion 3, the new station also houses Mini 14 and three trailers, for boats, ATV, and technical trainer. The boat trailer is parked inside the station, with the other two parked outside.<\/p>\n<p>Station 14 will also house a new shift Safety Officer, who will be placed in service in the coming days.\u00a0<\/p>\n<p><a href=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/sta14-harden-2021-mjl.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-6033\" src=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/sta14-harden-2021-mjl.jpg\" alt=\"\" width=\"1000\" height=\"562\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/sta14-harden-2021-mjl.jpg 1000w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/sta14-harden-2021-mjl-300x169.jpg 300w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/sta14-harden-2021-mjl-730x410.jpg 730w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/a><\/p>\n<p>April 16, 2021<br \/>\nConstruction nearing completion. Here&#8217;s a photo from last month:<\/p>\n<p><a href=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2021-03-15-rfd-sta14-construction-drone-mjl-01.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-5910 alignnone\" src=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2021-03-15-rfd-sta14-construction-drone-mjl-01.jpg\" alt=\"\" width=\"1000\" height=\"562\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2021-03-15-rfd-sta14-construction-drone-mjl-01.jpg 1000w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2021-03-15-rfd-sta14-construction-drone-mjl-01-300x169.jpg 300w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2021-03-15-rfd-sta14-construction-drone-mjl-01-730x410.jpg 730w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/a><\/p>\n<p><!--more-->August 10, 2019<br \/>\nWalls are going up!<\/p>\n<p><a href=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-08-10-rfd.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-4788 alignnone\" src=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-08-10-rfd.jpg\" alt=\"\" width=\"1000\" height=\"601\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-08-10-rfd.jpg 1000w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-08-10-rfd-300x180.jpg 300w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-08-10-rfd-730x439.jpg 730w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/a><\/p>\n<p>June 25, 2019<br \/>\nSite work is nearly finished on new Station 14 on Harden Road. Sediment monitoring is nearing completion for the back fill of the retaining wall and footers and under-slab utilities should begin in July 2019.<\/p>\n<p><!--more-->March 23<br \/>\nAdded link above to official project site. What&#8217;s happening at the construction site? Site work is finishing. Should see construction starting soon.\u00a0<\/p>\n<p><a href=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-03-23-rfd-sta14-site-drone-mjl-65.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-4342 alignnone\" src=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-03-23-rfd-sta14-site-drone-mjl-65.jpg\" alt=\"\" width=\"1000\" height=\"750\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-03-23-rfd-sta14-site-drone-mjl-65.jpg 1000w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-03-23-rfd-sta14-site-drone-mjl-65-300x225.jpg 300w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2019-03-23-rfd-sta14-site-drone-mjl-65-730x548.jpg 730w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/a><\/p>\n<p>July 25, 2018<br \/>\nSite work started this month. Crews have been digging a retention pond, among other activities. <a href=\"https:\/\/legeros.smugmug.com\/Facility-Projects\/RFD-Sta-14\">See more photos<\/a>.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-07-17-rfd-sta14-site-drone-mjl-01-2.jpg\" alt=\"2018-07-17-rfd-sta14-site-drone-mjl-01-2\" width=\"800\" height=\"600\" border=\"1\" \/><\/p>\n<p>January 17, 2017<\/p>\n<p><strong>Construction Bid Awarded<br \/>\n<\/strong><br \/>\nAt yesterday&#8217;s City Council meeting, the agenda included awarding the construction bid for Fire Station 14.\u00a0 Bid amount $6,845,670. Award to Pro Construction, Inc. Work to start within 60 days. The details of the consent agenda item\u00a0are below. Seems a safe presumption that it was approved.<\/p>\n<p>Also, the parcels on the site have been combined, and the property is addressed 3510 Harden Road:<\/p>\n<p><a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-01-17-rfd.jpg\"><img decoding=\"async\" class=\"alignnone size-full wp-image-2983\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-01-17-rfd.jpg\" alt=\"2018-01-17-rfd\" width=\"500\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-01-17-rfd.jpg 800w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-01-17-rfd-300x113.jpg 300w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-01-17-rfd-730x274.jpg 730w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/a><\/p>\n<p><strong>Construction Bid<\/strong><\/p>\n<p>From the agenda for the January 16, 2018, regular meeting of the Raleigh City Council (<a href=\"http:\/\/www.boarddocs.com\/nc\/raleigh\/Board.nsf\/goto?open&amp;id=AUPHXQ4AAA46\">see source<\/a>):<\/p>\n<p>Funding for construction for the replacement of Raleigh Fire Station 14 was included in the capital improvement program. \u00a0The project site is located at 3510 Harden Road. \u00a0The project includes construction of a new 18,100 [square-foot] fire station, including three apparatus bays. \u00a0While the building construction is standard, the location of the building requires considerable site work consisting of grading, filling and backfilling, retaining wall, utilities, concrete parking and fire truck aprons, and concrete sidewalk.<\/p>\n<p>On December 19, 2017, eight formal bids were opened for the Fire Station 14 construction project. Upon review of the submitted bids, three bids were rejected as non-responsive:<\/p>\n<ol>\n<li class=\"CxSpMiddle\">Focus Design Build, LLC (Contractor was not prequalified, which was a requirement for bidding. G.S. 134-135.8(d))<\/li>\n<li class=\"CxSpMiddle\">W.C. Construction Company, LLC (Contractors omitted required parts of the bid package)<\/li>\n<li class=\"CxSpMiddle\">Harrod and Associates Constructors, Inc. (Contractors omitted required parts of the bid package.)<\/li>\n<\/ol>\n<p>The lowest responsible bid was submitted by Pro Construction, Inc. in the amount with a bid of $6,845,670.<\/p>\n<p>Minority and Women Owned Business Enterprise (MWBE) participation is anticipated to be 29%. \u00a0MWBE documentation has been reviewed by MWBE staff.<\/p>\n<p>Funding is appropriated and the contract amount is within existing budgetary appropriations.<\/p>\n<p>In accordance with North Carolina General Statute 160A-499.4. &#8211; Notice Prior to Construction, the City is hereby providing public notice of the construction of the Fire Station 14 project, which is planned to begin construction within the next 60 days.<\/p>\n<p>December 28, 2017<br \/>\nAfter several months of unexpected project delays, the site was cleared in November. Groundbreaking is expected in January.<\/p>\n<p><a href=\"https:\/\/legeros.smugmug.com\/Facility-Projects\/RFD-Sta-14\">See more photos<\/a> on Mike&#8217;s new SmugMug site.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-2933\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2017-12-06-rfd-sta14-site-drone-mjl-3.jpg\" alt=\"2017-12-06-rfd-sta14-site-drone-mjl-3\" width=\"500\" height=\"375\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2017-12-06-rfd-sta14-site-drone-mjl-3.jpg 500w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2017-12-06-rfd-sta14-site-drone-mjl-3-300x225.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>November 9, 2016<br \/>\nOn Monday, November 7, another public meeting was held, to present the current plans for and receive feedback on the new Fire Station 14.<\/p>\n<p>Their presentation include included a site plan and more renderings. Construction is planned to start in June, and with a thirteen-month build time. Click to enlarge:<\/p>\n<p><a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd1.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1405\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd1a.jpg\" alt=\"2016-11-09-rfd1a\" width=\"300\" height=\"225\" border=\"1\" \/><\/a> <a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd4.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1411\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd4a.jpg\" alt=\"2016-11-09-rfd4a\" width=\"300\" height=\"225\" border=\"1\" \/><\/a><br \/>\n<a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd2.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"300\" height=\"180\" class=\"alignnone size-full wp-image-1407\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd2a.jpg\" alt=\"2016-11-09-rfd2a\" border=\"1\" \/><\/a> <a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd3.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"300\" height=\"180\" class=\"alignnone size-full wp-image-1409\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd3a.jpg\" alt=\"2016-11-09-rfd3a\" border=\"1\" \/><\/a><\/p>\n<p>The trees on the site\u2013or sites, as the parcels haven\u2019t been combined yet\u2013were cleared in recent weeks. Four empty houses are still standing. The fire department has used them for some training. They\u2019ll be demolished in the near future, likely around the holidays. Click to enlarge:<\/p>\n<p><a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd5.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1413\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd5a.jpg\" width=\"600\" height=\"450\" border=\"1\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd5a.jpg 600w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-11-09-rfd5a-300x225.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p>August 15, 2016<br \/>\nHere are pictures of the drawings displayed at the public meeting, including a simplified floor plan sketch from myself. Notice that the exterior materials are different\/different color than the Station 12 drawings seen in our <a href=\"http:\/\/legeros.com\/blog\/construction-update-on-new-fire-station-12\/\">prior post<\/a>. Click to enlarge, or <a href=\"http:\/\/legeros.com\/ralwake\/photos\/2016-08-09-rfd-public-meeting\/\">see more photos<\/a>:<\/p>\n<p><span id=\"more-1092\"><\/span><a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd1.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1121\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd1a.jpg\" width=\"600\" height=\"493\" border=\"1\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd1a.jpg 600w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd1a-300x247.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd2.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1123\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd2a.jpg\" alt=\"2016-08-15-rfd2a\" width=\"194\" height=\"146\" border=\"1\" \/><\/a> <a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd3.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1125\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd3a.jpg\" alt=\"2016-08-15-rfd3a\" width=\"186\" height=\"146\" border=\"1\" \/><\/a> <a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd4.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1127\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-15-rfd4a.jpg\" alt=\"2016-08-15-rfd4a\" width=\"200\" height=\"146\" border=\"1\" \/><\/a><\/p>\n<p>August 6, 2016<br \/>\nThe Raleigh Fire Department will hold a public meeting about rebuilding and relocating Fire Station 14 at 7:00 p.m. on Tuesday, August 9, at the Jaycee Park Community Center, 2405 Wade Avenue. The meeting, hosted by the Office of the Fire Chief and Stewart-Cooper-Newell Architects, will present a project overview, share current designs, and field citizen discussion and feedback. <a href=\"http:\/\/www.raleighnc.gov\/home\/news\/content\/CorNews\/Articles\/FireStation14News.html\">Read the entire press release<\/a>.<\/p>\n<p>Station 14 is located at 4220 Lake Boone Trail, on a wee parcel beside Rex Hospital. It\u2019s being relocated to the corner of Harding Road and Nancy Anne Drive, to a trio of parcels that\u2019ll be combined into a 2.22 acre site. <a href=\"http:\/\/legeros.com\/ralwake\/raleigh\/stations\/14.shtml\">Read more about the fire station and its history<\/a>.<\/p>\n<p><a href=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-06-rfd1.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-1090\" src=\"http:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-06-rfd1.jpg\" sizes=\"(max-width: 600px) 100vw, 600px\" width=\"600\" height=\"411\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-06-rfd1.jpg 600w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2016-08-06-rfd1-300x206.jpg 300w\" \/><\/a><\/p>\n<p>The new Station 14 will be nearly identical to new Station 12, and located at the corner of Bus Way and Poole Road. Both are designed to house an engine and ladder company, a Battalion Chief, and Division Chief. Construction on Station 12 starts in September. Construction on Station 14 will start in 2017.<\/p>\n<p><a href=\"http:\/\/legeros.com\/blog\/construction-update-on-new-fire-station-12\/\">See this blog post<\/a> from earlier this week, with details and drawings of the new Station 12. <a href=\"http:\/\/legeros.com\/ralwake\/photos\/weblog\/pivot\/entry.php?id=6677\">See also this blog archives posting<\/a> from 2014, about the first parcel purchased for Station 14.<\/p>\n<p>Watch this space for more information, after we attend the meeting on Tuesday.<\/p>\n<div data-animation=\"no-animation\" data-icons-animation=\"no-animation\" data-overlay=\"on\" data-change-size=\"\" data-button-size=\"0.7\" style=\"font-size:0.7em!important;display:none;\" class=\"supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-content supsystic-social-sharing-content-align-left\" data-text=\"\"><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter facebook\" target=\"_blank\" title=\"Facebook\" href=\"http:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Flegeros.com%2Fblog%2Frelocating-fire-station-14%2F\" data-main-href=\"http:\/\/www.facebook.com\/sharer.php?u={url}\" data-nid=\"1\" data-name=\"\" data-pid=\"1\" data-post-id=\"1092\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Relocating Fire Station 14 - Now in Service\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-facebook\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter twitter\" target=\"_blank\" title=\"Twitter\" href=\"https:\/\/twitter.com\/share?url=https%3A%2F%2Flegeros.com%2Fblog%2Frelocating-fire-station-14%2F&text=Relocating+Fire+Station+14+%26%238211%3B+Now+in+Service\" data-main-href=\"https:\/\/twitter.com\/share?url={url}&text={title}\" data-nid=\"2\" data-name=\"\" data-pid=\"1\" data-post-id=\"1092\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Relocating Fire Station 14 - Now in Service\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-twitter\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter pinterest\" target=\"_blank\" title=\"Pinterest\" href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url=https%3A%2F%2Flegeros.com%2Fblog%2Frelocating-fire-station-14%2F&description=Relocating+Fire+Station+14+%26%238211%3B+Now+in+Service\" data-main-href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url={url}&description={title}\" data-nid=\"7\" data-name=\"\" data-pid=\"1\" data-post-id=\"1092\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Relocating Fire Station 14 - Now in Service\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-pinterest\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>This is an ongoing blog posting about the relocating of Fire Station 14.\u00a0 See Legeros updates below. See also ongoing\u00a0Legeros photos. And here\u2019s the\u00a0official project site\u00a0from the city. Contents 7\/8\/21 &#8211; Now in Service 4\/16\/21 &#8211; Construction Nearly Completion 8\/10\/19 &#8211; Walls Going Up 6\/25\/19 &#8211; Site Work Nearly Finished 3\/23\/19 &#8211; Site Work Finishing &#8230;<\/p>\n<p><a href=\"https:\/\/legeros.com\/blog\/relocating-fire-station-14\/\" class=\"more-link\">Continue reading &lsquo;Relocating Fire Station 14 &#8211; Now in Service&rsquo; &raquo;<\/a><\/p>\n<div data-animation=\"no-animation\" data-icons-animation=\"no-animation\" data-overlay=\"on\" data-change-size=\"\" data-button-size=\"0.7\" style=\"font-size:0.7em!important;display:none;\" class=\"supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-content supsystic-social-sharing-content-align-left\" data-text=\"\"><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter facebook\" target=\"_blank\" title=\"Facebook\" href=\"http:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Flegeros.com%2Fblog%2Frelocating-fire-station-14%2F\" data-main-href=\"http:\/\/www.facebook.com\/sharer.php?u={url}\" data-nid=\"1\" data-name=\"\" data-pid=\"1\" data-post-id=\"1092\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Relocating Fire Station 14 - Now in Service\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-facebook\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter twitter\" target=\"_blank\" title=\"Twitter\" href=\"https:\/\/twitter.com\/share?url=https%3A%2F%2Flegeros.com%2Fblog%2Frelocating-fire-station-14%2F&text=Relocating+Fire+Station+14+%26%238211%3B+Now+in+Service\" data-main-href=\"https:\/\/twitter.com\/share?url={url}&text={title}\" data-nid=\"2\" data-name=\"\" data-pid=\"1\" data-post-id=\"1092\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Relocating Fire Station 14 - Now in Service\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-twitter\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter pinterest\" target=\"_blank\" title=\"Pinterest\" href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url=https%3A%2F%2Flegeros.com%2Fblog%2Frelocating-fire-station-14%2F&description=Relocating+Fire+Station+14+%26%238211%3B+Now+in+Service\" data-main-href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url={url}&description={title}\" data-nid=\"7\" data-name=\"\" data-pid=\"1\" data-post-id=\"1092\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Relocating Fire Station 14 - Now in Service\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-pinterest\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><\/div>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[10,9],"tags":[],"_links":{"self":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts\/1092"}],"collection":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/comments?post=1092"}],"version-history":[{"count":38,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts\/1092\/revisions"}],"predecessor-version":[{"id":6036,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts\/1092\/revisions\/6036"}],"wp:attachment":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/media?parent=1092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/categories?post=1092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/tags?post=1092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}