{"id":3279,"date":"2018-04-22T08:12:32","date_gmt":"2018-04-22T12:12:32","guid":{"rendered":"https:\/\/legeros.com\/blog\/?p=3279"},"modified":"2018-04-22T08:34:17","modified_gmt":"2018-04-22T12:34:17","slug":"contract-for-new-chapel-hill-fire-house-august-1921","status":"publish","type":"post","link":"https:\/\/legeros.com\/blog\/contract-for-new-chapel-hill-fire-house-august-1921\/","title":{"rendered":"Contract for New Chapel Hill Fire House &#8211; August 1921"},"content":{"rendered":"<p>From\u00a0excerpts of town minutes, as recorded as a nine-page typed document for the fire department.\u00a0<\/p>\n<p>Aug. 9, 1921 &#8211; P.154<\/p>\n<p>Contract for\u00a0 new Fire House with \u00a0J. T.\u00a0 Squires for\u00a0 $3,988. 18\u00a0 X\u00a0\u00a0 40\u00a0 ft. inside. Wall foundation \u00a0to\u00a0 be 21&#8243; thick; \u00a01st story 13&#8243; thick; 2nd\u00a0 story 8&#8243; thick. 1st floor to\u00a0 be 4&#8243;\u00a0 concrete, 1\u00a0 part cement,\u00a0 3\u00a0 parts sand \u00a0&amp; 5\u00a0 parts stone, etc. Stairway to\u00a0 be\u00a0 built in\u00a0 the\u00a0\u00a0 usual way, with\u00a0 rail and bolsters. All\u00a0 woodwork to have\u00a0 two\u00a0 coats\u00a0 of\u00a0 good\u00a0 paint.<\/p>\n<p>Plumbing:\u00a0\u00a0\u00a0 Shower\u00a0 bath\u00a0\u00a0 of\u00a0 standard quality.\u00a0\u00a0 Vitreous\u00a0\u00a0 china toilet\u00a0 combination.\u00a0\u00a0 One\u00a0 enameled\u00a0\u00a0 iron\u00a0 sink with\u00a0 hose\u00a0 connection.\u00a0\u00a0 Sewer\u00a0 to\u00a0 be standard cast\u00a0 iron from\u00a0 house\u00a0 to\u00a0 main.<\/p>\n<p>Electric\u00a0 Wiring:\u00a0\u00a0\u00a0 Nine\u00a0 electric lights to\u00a0 be installed .\u00a0 Wiring\u00a0 to\u00a0 be conduit.<\/p>\n<p><strong>Middle of Columbia Street<\/strong><\/p>\n<p>Said fire station was built of brick. It was ordered erected in a meeting on August 4, 1921. The location was &#8220;the middle of Columbia Street just north of Rosemary Street.&#8221; The cost was approximately $4,000. Mayor J. S. Roberson appointed Dr. Pratt and M. W. Durham to serve with the Fire Committee as a Building Committee to &#8220;let contract and supervise construction.&#8221;<\/p>\n<p>Here&#8217;s the building depicted in a Sanborn Fire Insurance map from 1925. See this <a href=\"https:\/\/www.legeros.com\/ralwake\/photos\/weblog\/pivot\/entry.php?id=6791\">January 2015 blog archives<\/a> posting for more information about prior and later fire station locations. Click to enlarge:<\/p>\n<p><a href=\"http:\/\/www.legeros.com\/ralwake\/photos\/weblog\/images\/2015-01-25-chfd-4.jpg\"><img decoding=\"async\" src=\"http:\/\/www.legeros.com\/ralwake\/photos\/weblog\/images\/2015-01-25-chfd-4.jpg\" width=\"500\" border=\"1\" \/><\/a><\/p>\n<p><strong>Vintage Image<\/strong><\/p>\n<p>Here&#8217;s a\u00a0vintage image of the building, circa 1920s. It was used until 1938, when a Town Hall and fire station was built beside this location, at the corner. Click to enlarge:<\/p>\n<p><a href=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-03-22-chfd1.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignleft size-full wp-image-3280\" src=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-03-22-chfd1.jpg\" alt=\"2018-03-22-chfd1\" width=\"1000\" height=\"921\" border=\"1\" srcset=\"https:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-03-22-chfd1.jpg 1000w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-03-22-chfd1-300x276.jpg 300w, https:\/\/legeros.com\/blog\/wp-content\/uploads\/2018-03-22-chfd1-730x672.jpg 730w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/a><\/p>\n<div data-animation=\"no-animation\" data-icons-animation=\"no-animation\" data-overlay=\"on\" data-change-size=\"\" data-button-size=\"0.7\" style=\"font-size:0.7em!important;display:none;\" class=\"supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-content supsystic-social-sharing-content-align-left\" data-text=\"\"><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter facebook\" target=\"_blank\" title=\"Facebook\" href=\"http:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Flegeros.com%2Fblog%2Fcontract-for-new-chapel-hill-fire-house-august-1921%2F\" data-main-href=\"http:\/\/www.facebook.com\/sharer.php?u={url}\" data-nid=\"1\" data-name=\"\" data-pid=\"1\" data-post-id=\"3279\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Contract for New Chapel Hill Fire House - August 1921\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-facebook\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter twitter\" target=\"_blank\" title=\"Twitter\" href=\"https:\/\/twitter.com\/share?url=https%3A%2F%2Flegeros.com%2Fblog%2Fcontract-for-new-chapel-hill-fire-house-august-1921%2F&text=Contract+for+New+Chapel+Hill+Fire+House+%26%238211%3B+August+1921\" data-main-href=\"https:\/\/twitter.com\/share?url={url}&text={title}\" data-nid=\"2\" data-name=\"\" data-pid=\"1\" data-post-id=\"3279\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Contract for New Chapel Hill Fire House - August 1921\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-twitter\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter pinterest\" target=\"_blank\" title=\"Pinterest\" href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url=https%3A%2F%2Flegeros.com%2Fblog%2Fcontract-for-new-chapel-hill-fire-house-august-1921%2F&description=Contract+for+New+Chapel+Hill+Fire+House+%26%238211%3B+August+1921\" data-main-href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url={url}&description={title}\" data-nid=\"7\" data-name=\"\" data-pid=\"1\" data-post-id=\"3279\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Contract for New Chapel Hill Fire House - August 1921\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-pinterest\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>From\u00a0excerpts of town minutes, as recorded as a nine-page typed document for the fire department.\u00a0 Aug. 9, 1921 &#8211; P.154 Contract for\u00a0 new Fire House with \u00a0J. T.\u00a0 Squires for\u00a0 $3,988. 18\u00a0 X\u00a0\u00a0 40\u00a0 ft. inside. Wall foundation \u00a0to\u00a0 be 21&#8243; thick; \u00a01st story 13&#8243; thick; 2nd\u00a0 story 8&#8243; thick. 1st floor to\u00a0 be 4&#8243;\u00a0 &#8230;<\/p>\n<p><a href=\"https:\/\/legeros.com\/blog\/contract-for-new-chapel-hill-fire-house-august-1921\/\" class=\"more-link\">Continue reading &lsquo;Contract for New Chapel Hill Fire House &#8211; August 1921&rsquo; &raquo;<\/a><\/p>\n<div data-animation=\"no-animation\" data-icons-animation=\"no-animation\" data-overlay=\"on\" data-change-size=\"\" data-button-size=\"0.7\" style=\"font-size:0.7em!important;display:none;\" class=\"supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-content supsystic-social-sharing-content-align-left\" data-text=\"\"><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter facebook\" target=\"_blank\" title=\"Facebook\" href=\"http:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Flegeros.com%2Fblog%2Fcontract-for-new-chapel-hill-fire-house-august-1921%2F\" data-main-href=\"http:\/\/www.facebook.com\/sharer.php?u={url}\" data-nid=\"1\" data-name=\"\" data-pid=\"1\" data-post-id=\"3279\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Contract for New Chapel Hill Fire House - August 1921\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-facebook\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter twitter\" target=\"_blank\" title=\"Twitter\" href=\"https:\/\/twitter.com\/share?url=https%3A%2F%2Flegeros.com%2Fblog%2Fcontract-for-new-chapel-hill-fire-house-august-1921%2F&text=Contract+for+New+Chapel+Hill+Fire+House+%26%238211%3B+August+1921\" data-main-href=\"https:\/\/twitter.com\/share?url={url}&text={title}\" data-nid=\"2\" data-name=\"\" data-pid=\"1\" data-post-id=\"3279\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Contract for New Chapel Hill Fire House - August 1921\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-twitter\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><a data-networks=\"[]\" class=\"social-sharing-button sharer-flat sharer-flat-8 counter-standard without-counter pinterest\" target=\"_blank\" title=\"Pinterest\" href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url=https%3A%2F%2Flegeros.com%2Fblog%2Fcontract-for-new-chapel-hill-fire-house-august-1921%2F&description=Contract+for+New+Chapel+Hill+Fire+House+%26%238211%3B+August+1921\" data-main-href=\"http:\/\/pinterest.com\/pin\/create\/link\/?url={url}&description={title}\" data-nid=\"7\" data-name=\"\" data-pid=\"1\" data-post-id=\"3279\" data-url=\"https:\/\/legeros.com\/blog\/wp-admin\/admin-ajax.php\" data-description=\"Contract for New Chapel Hill Fire House - August 1921\" rel=\"nofollow\" data-mailto=\"\"><i class=\"fa-ssbs fa-ssbs-fw fa-ssbs-pinterest\"><span>Share<\/span><\/i><div class=\"counter-wrap standard\"><span class=\"counter\">0<\/span><\/div><\/a><\/div>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,9],"tags":[],"_links":{"self":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts\/3279"}],"collection":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/comments?post=3279"}],"version-history":[{"count":7,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts\/3279\/revisions"}],"predecessor-version":[{"id":3287,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/posts\/3279\/revisions\/3287"}],"wp:attachment":[{"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/media?parent=3279"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/categories?post=3279"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/legeros.com\/blog\/wp-json\/wp\/v2\/tags?post=3279"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}