legeros.com > Raleigh/Wake Fire > Raleigh > History > > The Metropolitan Fire > Timeline |
Last updated June 5, 2017.
Note: Times do not (yet) include fractional seconds.
Day |
Time |
Milestone |
Notes |
Thur |
22:02
or 22:03 |
Pre-alert. |
HQ pre-alerts on radio channel with
short transmission: "Structure fire, 400 West North Street." |
Thur |
22:03 |
First alarm
dispatched. |
Automated dispatch, via locution. 400
W. North Street, which is the closest address that callers can
determine. E13, E1, E3, E5, L4, L2, R1, Bat 3, Bat 2, C420. Tac 18. |
Thur |
22:05 rte |
Bat 3 informed of multiple callers by
HQ. |
HQ advises that they’re receiving
multiple, multiple calls confirming that this is a working fire. Bat
3 advises HQ to upgrade to working fire. |
Thur |
22:05 |
Working fire
dispatched. |
Automated dispatch, via locution. A1,
C20, C401. |
Thur |
22:05 |
E13 arrives
and establishes command. |
First
arriving unit. Reports heavy fire showing from second floor.
Immediately requests second alarm, see below.
E13 parks on
Jones, at southeast corner of Metropolitan (Div A/D), connects to
hydrant mid-block on Jones Street, and deploys portable monitor to
protect exposures on south (Div A) and southeast (Div C/D) sides.
“Thirteen’s
on scene, thirteen has command. [ Something something ] street.
Headquarters give me a second alarm. Staging will be 42nd Street
Oyster bar. Five story, under construction. Residential structure.
150 by 200. Heavy fire showing from division two. Engine 13 is par
three. Thirteen has their own hydrant.” |
Thur |
22:06 |
Second alarm
requested for fire. |
Requested by command (E13), see
above, and follows E13 officer's description of fire conditions.
Staging area is designated as at 42nd Street Oyster bar, at corner
of Jones and West. |
Thur |
22:06 |
Second alarm
requested for EMS. |
Requested by EMS District Chief and
immediately after second alarm for fire is requested. By that time,
two EMS District Chiefs have arrived, and established their command
location on the southwest corner of Harrington and Jones. |
Thur |
22:06 |
Car 401 (investigator) arrives. |
He's assigned as Staging Officer. He
also calls the incoming investigator on "C" platoon at home, and
requests a response. |
Thur |
22:06 rte |
HQ tells all EMS units to switch to
own radio channel, Tac 19. |
|
Thur |
22:06 |
E1 arrives. |
Parks at
Jones and Dawson, connects to hydrant on northeast corner, and
deploys portable monitor in alley on the east side (Div D) to
protect exposures. |
Thur |
22:06 |
L4 arrives. |
First
arriving ladder. Parks behind E13 on Jones. They begin repositioning
the apparatus, to prepare for set-up. The fire is also rapidly
spreading, and the move their apparatus off the block, parking just
west of the intersection of Jones and Harrington and the southwest
corner (Div A/B), on Jones Street, and facing west. They are
supplied by E3, which is boosted by E2, both at a hydrant at the
corner of Jones and West. |
Thur |
22:07 |
Second alarm
dispatched. |
Automated dispatch, via locution. E6,
E2, Sq7, L7, L3, Bat 5. |
Thur |
22:07 |
E3 arrives. |
Parks at Jones and West, and connects
to hydrant, and will supply L4. Crew is directed to evacuate the
Link Apartments, the west exposure (Div B). They perform a quick
evacuation, and then are assigned to fire attack in the building.
The building has sprinklers, which activate. They check each floor,
find some fire on the sixth floor, and deploy high rise hose via
standpipe to extinguish. |
Thur |
22:07 rte |
Command (E13)
directs third arriving engine (E3) to start evacuating the Link. |
“Command to, uh, Engine 5 or, excuse me, third-arriving engine. Go
to the apartments that are at, uh… yeah, go to those apartments
right there where you’re at, start evacuating that building. We’re
not going to be able to stop this.” |
Thur |
22:08 |
L2 arrives. |
Parks on Harrington, mid-block, north of Jones. They attempt to
connect to a hydrant on the southeast corner of Harrington and Lane,
after climbing over a concrete barrier and cutting through fence.
The hydrant is a new and not operational. L2 is then brought a
supply line from E5, which is subsequently supplied by Sq14.
With heavy fire threatening their apparatus, they back their ladder
to the northwest corner (Div B/C). They use their master stream to
extinguish the fire threatening their truck. Then they move
They repeat this action twice, moving the ladder forward, until it
has sufficient reach to begin spraying the Link Apartments, for
exposure protection. |
Thur |
22:08 |
E5 arrives. |
Parks at Harrington and Lane, having laid a supply line for L2. Two
personnel stay at the truck to assist with water supply, while two
others continue to command post, and are assigned to assist with
operations in the two high-rise exposures. |
Thur |
22:08 |
Third alarm
requested. |
Command (E13) continues on the radio,
noting that the building has no fire protection in place, fire is
moving entire length of block, and evacuation needs to start at
seven-story apartments at Harrington and Jones. |
Thur |
22:08,
by this time |
|
Flames
are reaching 200 feet in the air, and the fire is generating its own
wind, pushing the flames toward the south (Div A) and east (Div D)
sides of the building, and across Jones Street onto the high-rise
Quorum Center. |
Thur |
22:09 |
Third alarm
dispatched. |
Automated dispatch, via locution. E11, E20, Sq14. |
Thur |
22:09 rte |
Command (E13) issues a collapse
warning. |
Tells units “on the corner” (which
corner) to prepare for a collapse. Also tells Ladder 4, when fire
gets to your end of the corner (Div A/B), it’s probably going to
collapse as well. |
Thur |
22:09 rte |
Command (E13) also tells HQ of a
second working fire. |
He says that have a working fire on
the east (Div D) exposure [the League of Municipalities building]. |
Thur |
22:09 |
R1 arrives. |
Parks in lot opposite intersection of Harrington and Lane. Personnel
first assist L2 with accessing hydrant inside construction fence, on
northwest corner of fire building sit (Div B/C), then assist with
establishing a water supply for a portable monitor (and Ladder 4) at
Harrington and Jones. Then they're directed to the Quorum Center,
under the command of Bat 3, and start primary searches on the fourth
floor, continuing to the 11th floor. |
Thur |
22:10 rte |
Bat 3, en route, informs all ladders
to try to position at the corners of the building. And that the fire
will be 100% defense. |
|
Thur |
22:10 rte |
Command (E13) asks HQ to notify water
department to boost pressure for the area. |
|
Thur |
22:10ish |
Bat 1 at
Station 19 begins implementing All Hazards Plan. |
This will adjust responses and resources for rest of city. He begins
moving engine and ladder companies that are still in service, from
their station "farther out" to those empty stations "closer in." He
also contacts the Wake County Fire Marshal's office, and requests
companies from county fire departments, to assist with coverage at
city stations.
He’ll soon be assisted by Bat 4 at Station 23. They’ll be the two
remaining Battalion Chiefs in service, during the fire.
At Station 19, incoming Battalion Chief Rob Mitchell will later
report for duty, and begin “riding the car” for any calls, for the
remainder of the shift.
|
Thur |
22:11 rte |
Bat 3 directs E5 to Harrington and
Lane, to establish a water supply for L2, on that corner of the
building (Div A/B). |
|
Thur |
22:11 |
Bat 3
arrives. |
First
Battalion Chief on scene. He will soon assume command from E13
officer. |
|
|
|
|
Thur |
22:11 |
Bat 5 arrives. |
Second
Battalion Chief on scene. He takes position along Jones Street, on
the southeast side of the Metropolitan (Div A/D). |
Thur |
22:11-22:12 rte |
Command (E13) gives updates to Bat 3.
|
He reports his location, that E13 is
closer to Dawson Street.
He also informs about fire showing in
the exposure on the east side (Div D) [in the League of
Municipalities building].
He reports a three-story, masonry and
frame office building, 150 by 75, with fire showing. He notes that
they’ll (someone will) need to make entry into that building soon. |
Thur |
22:12 |
Bat 3 assumes
command from E13 officer. |
He designates the command location as
the corner of Jones and Harrington. |
Thur |
22:12 |
Car 20 arrives. |
Does not assume command, but assists with setting up the components
of the command structure. |
Thur |
22:12 |
Fourth alarm
requested. |
Bat 3
requests a fourth alarm to the earlier staging area. Reports as an
approximately 400 by 500, five-story, wood frame building that’s
about 30% fully-involved.
|
Thur |
22:13 |
Fourth alarm
dispatched. |
Automated dispatch, via locution.
E8, E12, E9. |
Thur |
22:13 |
E2 arrives. |
Parks at Jones and West, and connects to the hydrant being used by
E3, and boosts pressure for E3, which is supplying L4. The driver
stays with apparatus, and the other two members first tasked with
searches in the Quorum Center. |
Thur |
22:13 |
E6 arrives. |
Stages at Jones and West. The driver is assigned role of Staging
Officer. Remaining crew assists others with hydrant connections for
monitors and ladders, and is then tasked with searches in the Quorum
Center. |
Thur |
22:13 |
Sq7 arrives. |
Catches a hydrant at Edenton and Harrington, and lays the line north
on Harrington. Parks just south of Jones, at the Quorum Center.
Charges supply line. Connects to Quorum Center FDC, but doesn’t
charge. Personnel enter building and assist with evacuations. |
Thurs |
22:13 rte |
L2 setting up at Harrington and Lane,
they report. |
|
Thur |
22:13 rte |
E5 at Harrington and North with a
hydrant, they report. |
They’re waiting to bring a supply
line to L2 when it gets in position. E5 also asks about
shutting the railroad down, as they’ll cross tracks while
laying their line. |
Thurs |
22:14 rte |
Police
requested to shut down all traffic into scene for two blocks in all
direction, by command (Bat 3). |
No traffic to be allowed in, except
emergency vehicles. |
Thur |
22:15 |
Car 2 arrives. |
Asst. Chief of Operations (Harvey). |
Thur |
22:15 |
Bat 2 arrives. |
Third Battalion Chief on scene. Parks on Lane Street. Command
directs Bat 2 to take command of the north side (Div C). |
Thur |
22:15 |
Car 420 arrives. |
Platoon Deputy Fire Marshal. Stages at Edenton and Dawson. |
Thur |
22:15 |
E11 arrives. |
Traveling south on Dawson Street, they observe flames on the roof of
a church at Edenton and Dawson.
They "lay in wet" from a hydrant on Dawson Street, and use their
deck gun to extinguish the flames.
They also pull hand lines, using a courtyard lay, to extinguish
flaming materials within a walled area, in the rear of the church. |
Thur |
22:15 rte |
Car 20 radios
command that a tower crane is involved. |
And says they might not be able to see it, within their field of
vision. |
Thur |
22:16 |
L7 arrives. |
Bat 3 gives directions to L7, directing them to come in off Dawson
Street, to Jones, to southeast (Div C/D) corner.
E13 is parked at that location, however. L7 parks at Dawson and
Jones (as directed by Bat 5?), and deploy aerial stream, attacking roof
fires on surrounding buildings to east (Div D) and southeast (Div
A/D) of Metropolitan.
After this brief operation, they reposition to the southeast corner
of the Metropolitan (Div A/D), where E13 first parked. [By that
time, E13 will have been moved, due to high heat.]
L7 begins aerial operations, first protecting exposures, and then on
the fire building. |
Thur |
22:17 |
E20 arrives. |
Stages on West street. Personnel are assigned to the Quorum Center,
for searches and fire attack. |
Thur |
22:17 rte |
L2 directed to northwest corner (Div
B/C) by Bat 2. |
|
Thur |
22:17 rte |
E1 moves portable monitor, to protect
exposures on east side (Div D). |
E1 radios command that they’re on the
southeast corner (Div A/D), with a portable monitor, and trying to
reposition to protect the single-story building on the east side
(Div D), from the heavy fire conditions. |
Thur |
22:18 |
L3 arrives. |
Parks facing north on Harrington on south side of Jones Street
intersection (Div A/B). They begin aerial operations, protecting the
Quorum Center.
They also assist setting up a portable monitor on Harrington at
Jones, supplied by E3, also protecting the Quorum Center.
Two off-duty personnel arrive, take over operation of the apparatus,
and the four-person crew from L3 is assigned to other tasks. |
Thurs |
22:18 rte |
Additional buildings involved with
fire on the east side (Div D), reports Bat 5. |
|
Thur |
22:19 |
Sq14 arrives. |
Parks at Harrington and North, and boosts pressure to L2, using
supply line laid by E5. Driver remains at apparatus, and two
personnel report to command, and are assigned various tasks. |
Thur |
22:19 |
Tower crane
collapses. |
Unidentified person on radio
transmits “crane’s coming down!” |
Thur |
22:20 |
E8 arrives. |
Stages on Jones Street. Crew is assigned to search group for Quorum
Center. |
Thur |
22:20 rte |
E13 ordered to move from their
position at the southeast corner (Div A/D) by Bat 5. |
The heat is
starting to buckle pavement, burn and melt equipment on the engine,
and causing the firefighters protective clothing to begin smoking. |
Thur |
22:20 rte |
Glass is falling on Jones Street, E20
reports. |
|
Thur |
22:20ish |
Car 2
(Harvey) assumes command from Bat 3. |
|
Thurs |
22:20-21 rte |
Command (Car
2) calls for all units to case radio traffic. |
Confirms that the construction crane has collapsed. He begins
confirming that all personnel are accounted for.
Bat 2 move from north (Div C) to west (Div B) side, and accounts for
L2 personnel. |
Thur |
22:21 |
E12 arrives. |
Stages until they are directed to extinguish spot fires, around the
Metropolitan. Then directed to assist E11, with extinguishing fires
at church at corner of Edenton and Dawson. |
Thur |
22:22 |
E9 arrives. |
Directed to lay supply line from North and West streets, into
parking lot opposite Harrington and Lane.
Supplies portable monitor, which is directed onto the west side of
the building (Div B), from mid-block on Harrington.
Later supplies second monitor, the 1000 GPM monitor from Squad 14,
that’s also deployed mid-block on Harrington. |
Thurs |
22:22-23 rte |
Command tells all units entering the
city to stage behind Station 1. |
|
Thurs |
22:22-23 rte |
Command requests [from staging] that
two engines and one ladder company meet at the Quorum Center, as
they have a report of subjects trapped on the tenth floor. |
|
Thurs |
22:23 rte |
E11 is extinguishing fires at the
church at Dawson and Edenton, they report. |
|
Thur |
22:23,
about |
Photographer Legeros arrives. |
|
Thur |
22:25 rte |
Command
requests five more Tac channels from dispatcher. |
Command announces Tac 22 is the
staging channel, and all incoming units should switch to that
channel. |
Thur |
22:26 |
A1 arrives. |
Mobile
air unit. Parks at Jones and West, in parking lot of 42nd Street
Oyster Bar. |
Thur |
22:26 rte |
L2 is starting to flow on Harrington,
from the northwest corner (Div B/C), Bat 2 reports. |
|
Thur |
22:26 rte |
L3 is getting into position on
Harrington, they report. |
|
Thur |
22:28 |
Calls received [at ECC] for Methodist
Adult Center on fire, at Edenton and Dawson. |
|
Thur |
22:30, by this time |
Bat 4 at Station 23 is assisting Bat
1 at Station 19, with logistics, manpower, and apparatus coverage. |
|
Thur |
22:30,
about |
Car 5 (Hocutt) arrives. |
Assistant Chief of Training, arrives. He first takes command at the
church at Edenton and Dawson. He’ll assist at the command post and
later take command on the east side of the Metropolitan (Div D).
|
Thurs |
22:30,
about |
High-rise
operations initiated at Quorum Center |
With
Battalion 3 as branch director.
|
Thurs |
22:30,
about
|
|
Chief
officers are or will be assigned as operational command/branch
director in several locations, during the incident: |
Thur |
22:31 rte |
Fire impinging upon the Link
Apartments, Bat 2 reports.
L2 now repositioning, moving 50-100
feet south, closer to fire, Bat 2 also reports. |
|
Thur |
22:32 |
Fifth alarm
dispatched. |
Automated dispatch, via locution. E15, E27, E26. |
Thur |
22:32 |
Calls received [by ECC] for fire on
roof of Sacred Heart Cathedral at 200 Hillsborough. |
|
Thur |
22:32 rte |
L3 getting ready to set up at Jones
and Harrington, to protect exposures, they report. |
|
Thur |
22:32 rte |
HQ reports they’ve received calls
about a fire at the church at McDowell and Hillsborough. |
|
Thur |
22:36 rte |
E9 prepares to lay supply line into
the parking lot on west side (Div B), to supply portable monitor
which will be used to extinguish fire on exterior of Link
Apartments. |
|
Thur |
22:38 |
E10 dispatched to McDowell and
Hillsborough streets |
Reported fire on the roof of the
church. They extinguish with booster line, and ground ladders. |
Thur |
~22:38
|
L6 move-up to Sta 17.
|
|
Thur |
22:39 rte |
HQ has report of another building
with possible fire, adult care center at 228 W. Edenton. |
|
Thur |
22:39-40 rte |
Car 20 takes over command of Link
Apartments on west side (Div B) exposure. |
Four-story condo. Small flames on the
outside. Two crews are operating inside. |
Thur |
22:39-40 rte |
Command reports E13 is checking
exposure at 228 W. Edenton Street. |
|
Thur |
22:41 rte |
L7 reports that they see spot fires
on the roof of the church youth center, on the east side of the
Quorum Center. |
Command assigns that fire to Bat 5. |
Thur |
22:42 rte |
Car 4 informs command that he’s at
the EOC. |
Command requests help with monitoring
the tac channels, to make sure they don’t miss anything, especially
any emergency button activations. |
Thur |
22:44 |
E17 dispatched (from Station 1?) to 115 W. McDowell Street. |
Small mulch fire, found by police officer. |
Thur |
22:44 rte |
Car 5 on scene with E11 crew at
Hillsborough and Dawson, at the church. |
|
Thur |
22:45 |
E27 arrives. |
Crew first assigned to searching exposures. |
Thur |
22:45 rte |
L7 is moving to new position, reports
Bat 5.
|
The aerial platform is moved from
Dawson at Jones, to the southeast corner (Div A/D) of the
Metropolitan. |
Thur |
22:45 rte |
L2 is being repositioned again,
moving again 50-100 feet south on Harrington, reports Bat 2.
|
They are working to reach the Link
Apartment—their truck has only a 75-foot aerial ladder, not a
100-foot—and are also extinguishing fire beside the apparatus, to
prevent damage. |
Thur |
22:47 rte |
Portable monitor on Harrington, on
west side (Div B), begins flowing, supplied by E9. |
|
Thur |
22:47 rte |
Command tells Deputy Chief of
Training that their resources can respond to the scene. |
He’s told to switch to Tac 22, and
contact staging. |
Thur |
22:48 rte |
Command requests HQ broadcast to
arriving units that staging is at Station 1, and the rear parking
lot of Fire Administration. |
|
Thur |
22:48-49 rte |
L2 begins flowing water again, after
being repositioned. |
|
Thur |
22:49 |
E15 arrives. |
Crew first assigned to searching Link Apartments. Apparatus is later
connected to Link sprinkler system, using nearby hydrant, with
Assistant Fire Marshal Henshaw operating. System is not charged. |
Thur |
22:49 rte |
Car 20 requests [from staging] one
engine company with high-rise pack, to assist the two companies in
the Link. |
He provides an update: the sprinkler
system has held all floors in check. With one more company, interior
ops will be set. Also has a portable monitor being deployed, for the
exterior. He says it looks like the fire is under control. |
Thur |
22:49 rte |
Engine (E11 or E12) is spraying water
on the roof of the church at Edenton and Dawson, using their
monitor. |
|
Thur |
22:54 rte |
HQ reports another building to check,
104 Hillsborough Stree, First Baptist Church, roof reported on fire. |
E26 arrives at staging a few moments
later, and is directed to the fire. See below. |
Thur |
22:54 |
E26 arrives. |
From staging, dispatched to structure fire at 215 S. McDowell. No
fire found, and they return to staging. Crews are then directed to
search the single-story industrial building on the north side of the
Link Apartments, which had been struck by the collapsing crane. |
Thur |
22:56 |
E21 discovers fire on the roof of the
church at 104 Hillsborough Street. |
They
request a ladder truck to reach the roof. With L9 assisting, they
find and extinguish burning leaves on the roof. They also check the
interior of the building for hot spots, and find none.
|
Thur |
After 22:56 |
L9 (from Station 1?) dispatched to 104 Hillsborough St. |
|
Thur |
22:57 rte |
L7 has moved to the southeast corner
(Div A/D) and is about to extinguish fires on the roof of the youth
center, beside the Quorum, reports Bat 5. |
|
Thur |
22:58 rte |
E11, E12 crew will clear church fire
in a few minutes and head to staging, reports Bat 5. |
|
Thur |
23:00,
about |
Training Division personnel arrive on
West Street, including staff and recruit academy instructors (14),
and firefighter recruits (27). They arrive with two training
engines, and the RFD commercial bus. |
|
Thur |
23:01 |
Quorum Center
incident under control. |
|
Thurs |
23:02 rte |
HQ ask command to check Doug Sutton
Insurance building at Jones and McDowell again, they have reports of
the roof on fire. |
Bat 5 copies the traffic, and will
address. |
Thur |
23:02 rte |
Car 20 requests two personnel,
including a driver, to the Link, to use E15 to connect to the
building’s standpipe system. |
He notes that Assistant Fire Marshal
Tim Henshaw is waiting for them, to give them directions. |
Thur |
~23:03 |
E4 move-up to Sta 1. |
|
Thur |
23:05-6 rte |
Crew is checking the insurance
building at Jones and McDowell and will report back, reports Bat 5. |
|
|
|
|
|
Thur |
~23:10 |
E29 move-up to Sta 8. |
|
Thur |
23:12 rte |
Temporary rehab has been established
at Harrington and Edenton, announces command. |
All crews are requested to start
reporting to that location for rehab. |
Thur |
23:12 rte |
Three buildings are on fire on the
east side (Div C) of the Metropolitan, reports Car 3. |
Two buildings with roof fires, and
third building [League of Municipalities] with three rooms on fire
on third floor.
Asks for a ladder to be sent to that
location. He has one piece of apparatus [E13], but wants another,
preferably a ladder. |
Thur |
23:14 rte |
E9 officer assumes command on west
side of fire building (Div B) from Bat 2 . |
Bat 2 going to east side (Div C), to
assist with those operations.
|
Thur |
23:15 rte |
E26 reports they are heading to 215
S. McDowell Street. |
|
Thur |
23:15 rte |
HQ asks command about another
building, Jones and Dawson, insurance company. |
They are still receiving calls. |
Thur |
23:17 |
Link Apartments incident under control. |
Crews are still
in the building, but fire is under control. |
Thur |
23:18 rte |
L2 is moving to
the other side of the Metropolitan, for the exposure on fire on the
southeast (Div A/D) corner, reports Bat 2. |
The ladder crew
is “breaking it down now.” |
Thur |
23:19 rte |
Permanent
rehab now established at Jones and West, announces command. |
Directs all units in temporary rehab
to report to that location. |
Thur |
23:20 rte |
Bat 2 provides updates to Command:
He and Car 3 are working to hit the
heavy fire in the League of Municipalities building.
Church fire is under control. One
unit is there, standing by. Also being monitored by Car 420.
Three engines are covering
Hillsborough Street for falling embers, notes radio traffic.
The League of Municipalities building
is the biggest situation they have, beside the Metropolitan. |
|
Fri |
23:21-22 rte |
Bat 2 requests more resources from
command in Div C. |
|
Fri |
23:22 rte |
E26 arrives 216 S. McDowell, nothing
showing. |
No fire found at location. They
report all clear and returning to staging at 23:36. |
Fri |
23:23 rte |
L2 en route to east side (Div D) from
west side (Div B), reports Bat 2. |
|
Fri |
23:27 ish |
E9 driver tells E9 officer that a
train is inbound, as reported by Police. |
They are trying to get the train
stopped. E9 driver provides update three minutes later, that the
train has been stopped. |
Thur |
23:27 ish
|
L2 moving into position on the east side (Div D) of the
Metropolitan. |
Bat 2 tells L2 to send their crew and a 25 foot ladder, to get on
a building roof with a hand line, to extinguish the fire. L2 is
subsequently parked in Div D, parallel to Jones Street, and facing
Div D. Their ladder is used as an aerial stream on the Metropolitan,
and then as an aerial standpipe for crews inside of the League of
Municipalities Building. |
Thur |
23:31 rte
|
C20 reports that two crews (four people) will be operating in the
Link Apartments, just doing overhaul. |
|
Thur |
~23:32
|
E18 move-up to Sta 9. |
|
Thur |
23:36 rte |
E9 is preparing to flow a second
monitor on the west side (Div B) of the Metropolitan. |
Later advises it’s a 1000 GPM monitor, using two three-inch
lines. |
Thur |
23:39-40 rte |
L7 operator cautions L7 nozzle that
their aerial stream is about to knock down a back wall. |
By this time, some sections of brick wall are still standing on
the east side (Div D) of the Metropolitan. |
Thur |
23:42 rte |
HQ asks command if they can check the
report of a fire alarm activation at 215 N. Dawson. |
Bat 5 tells command that that’s where crews are operating on the
east side (Div D) of the Metropolitan. |
Thur |
~23:46 |
E10 move-up to Sta 2. |
|
Thur |
23:46 rte |
Fire(s) in parking deck of
Metropolitan confirmed by Bat 2 to command. |
Initially thought to be one or more vehicle fires. Building
materials on the roof, and the concrete in the structure is burning. |
Thur |
23:47 rte |
Three reserves are en route, fully
staffed, EOC tells command. |
EOC also reports that county units are covering the city. |
Thurs |
23:48 rte |
Animal control officers requested to
command post, by command to HQ. |
HQ confirms request received, but it will take a little while, as
the officers have to be paged out. Needed for a displaced canine. |
Thur |
23:50 rte |
Bat 5 asks L7 if there’s any fire on
the roof of the Reynolds Building. |
L7 confirms fire on all four corners, plus a ten-by-ten foot
collapse on the Div C/D corner. |
Thur |
23:52 rte |
215 N. Dawson Street building is
under control, Command tells HQ. |
The building had already been taken care of, Car 3 reports.
Command tells HQ that they can disregard any additional alarms from
the building. |
Thur |
23:55 rte |
The two portable monitors on the west
side (Div B) of the Metropolitan are shut down, E9 officer tells Bat
2. |
Because they see several firefighters doing a search in the area
that they’re spraying. After three minutes, they resume spraying. |
Fri |
00:02 rte |
EMS has established a rehab area at West and
Jones, announces command. |
|
Fri |
00:10 rte |
Command requests 100-foot ladder to
scene. |
Have them switch to Tac 18, for
specific location. Tells HQ to dispatch L8. |
Fri |
00:12 rte |
L8 dispatched. |
|
Fri |
00:13 rte |
L8 en route. |
Calls Command on Tac 18 and is told
to switch to Tac 25, and will be reporting to Car 5. |
Fri |
00:22 rte |
E9 tells Bat 2 that they see some
fire on the opposite side (Div C) of the Metropolitan, somewhere in
the parking deck. |
E9 says they’ll try to “lob some
water” and Bat 2 tells them to proceed, as all crews in Div C are in
safe locations. |
Fri |
00:25 |
L8 arrives. |
Special-called for burning
construction materials on top of parking deck on north side (Div C)
of Metropolitan, for use as aerial standpipe. Later used to flow
water onto Metropolitan. |
Fri |
00:31 rte |
Bat 5 gives accountability report: R1
with 5, E15 with 4, E11 with 2, E12 with 3, L7 with 4. He’s on Div
C/D corner with L7 on Tac 18. |
|
Fri |
00:34 rte |
Norfolk Southern has shut down the
rail line that crosses West and Harrington streets, announces
Command. |
Engine 9 still has a supply line
across the tracks on West Street. |
Fri |
00:39ish |
Command asks Bat 5 about status of
Dawson Street, can it be opened. |
Bat 5 replies that east side (Div D)
operations still have a line across Dawson Street, and cannot remove
until the fire is under control in the League of Municipalities
building. |
Fri |
01:10 |
Metropolitan
Apartments fire under control. |
Command to HQ, “Harrington Street
fire is under control. We’re in overhaul procedures now.” |
Fri |
01:22 |
E15 clears. |
|
Fri |
01:27 |
E26 clears. |
|
Fri |
01:28 |
L4 clears. |
|
Fri |
01:44 |
E2 clears. |
|
Fri |
01:50 |
E5 clears. |
|
Fri |
02:03 |
E11 clears. |
|
Fri |
02:10 |
Squad 7 clears. |
|
Fri |
02:16 |
E27 clears. |
|
Fri |
02:20 |
R1 clears. |
|
Fri |
02:29 |
E12 clears. |
|
Fri |
02:37 |
Squad 14 clears. |
|
Fri |
02:51 |
Car 420 clears. |
|
Fri |
02:58 |
E20 clears. |
|
Fri |
Before
03:00 |
L210 dispatched. |
|
Fri |
03:00 |
L210 arrives. |
Reserve
apparatus staffed with callback personnel. |
Fri |
03:14 |
E6 clears. |
|
Fri |
03:14 |
E9 clears. |
|
Fri |
Around
03:29 |
A2 dispatched |
Second mobile air unit, relieving
first unit. |
Fri |
03:50 |
E8 clears. |
|
Fri |
03:56 |
Bat 2 clears. |
|
Fri |
04:00 |
Car2 clears. |
|
Fri |
04:08 |
A1 clears. |
|
Fri |
04:09 |
E1 clears. |
|
Fri |
Before 04:24 |
E221 dispatched. |
|
Fri |
04:24 |
E221 arrives. |
Reserve engine staffed with callback personnel. Relieves L8
personnel. |
Fri |
04:40 |
L2 clears. |
|
Fri |
04:44 |
Car 401 clears. |
|
Fri |
04:45 |
Car 20 clears. |
|
Fri |
04:52 |
A2 clears. |
|
Fri |
04:52 |
Bat 3 clears. |
|
Fri |
04:52 |
E3 clears. |
|
Fri |
04:52 |
E13 clears. |
|
Fri |
04:52 |
E221 clears. |
|
Fri |
04:52 |
L8 clears. |
|
Fri |
~04:52 |
Dispatch for structure fire at 214 N.
Harrington. |
Need details. Was there anything to
this call? |
Fri |
04:53 |
L3 clears. |
|
Fri |
04:53 |
L7 clears. |
|
Fri |
~05:00 |
Bat 4 arrives. |
|
Fri |
06:30 |
Car 2 arrives EOC. |
|
Fri |
06:54 |
Dispatch for structure fire for 2804
Barwell Road. |
E12,
E21, E10, E11, L8, L2, R1, Bat 2, Bat 5. Arriving units find a
working fire.
|
Fri |
~06:55 |
E5 move-up to Sta 12. |
|
Fri |
~06:58 |
Working fire dispatch for 2804
Baawell Road. |
C20,
C401, A1. |
Fri |
07:30,
by this time |
Car 5 (Hocutt) returns to scene. |
Assists with coordination of removal
of glass from Quorum Center, conducted during day. |
Fri |
07:55 |
Bat 4 clears. |
Relieved by "C" shift counterpart. |
Fri |
08:00,
by this time |
|
L7, L9
are flowing water onto fire building. E3 at Jones and West,
connected to hydrant. Bat 3 at Jones and Dawson, in parking lot of
church youth center. Location for command and media. |
Fri |
Morning |
OFM contacts city building
inspectors, request to meet at site. |
·
0800 –
Office of Fire Marshal (OFM) via Car 4 (Fire Marshal) contacts city
Chief Building Inspector, requests meeting at scene at 09:00, to begin evaluation of surrounding
buildings for structural integrity.
·
0900 –
Car 4, Chief Building Inspector (and others?)
meet. Create teams to begin evaluating surrounding buildings.
How many teams? Each team has a
member from each trade: building, electrical, plumbing, mechanical,
and fire.
·
Team begins
evaluating surrounding buildings. |
Fri |
Morning |
Asst.
Fire Marshal arrives EOC, to answer OFM related questions. |
Phone
number is published, for people affected by the fire. |
Fri |
Morning |
Raleigh ATF agent arrives. |
|
Fri |
Morning |
Fire investigation team meets |
·
Capt. Gaster
·
Raleigh PD
detective
·
Raleigh ATF
agent |
Fri |
After
09:00 |
|
Legeros observes:
·
L7, L9 with
aerial streams onto Metropolitan site.
·
E3 at Jones
and West, connected to hydrant.
·
B3 at Jones
and Dawson, SW corner, parking lot of youth center.
·
Car 420, OFM
Asst. Fire Marshal x 2 on scene.
·
City
inspectors on scene.
·
EMS 1, EMS 11
at scene.
·
Media on
Jones Street at Dawson, SW corner, parking lot of youth center. |
Fri |
09:30 |
L210 clears. |
|
Fri |
13:00 |
Fire
investigation team meets with city officials, including Fire Chief,
Police Chief, and City Manager.
|
They
discuss the investigation, the scope of the incident, and decide to
request a response from the ATF National Response Team, to provide
additional resources. |
Fri |
Afternoon |
Building survey teams meet with owners of each building, to review
findings and assist with developing plans to reoccupy each
structure. |
|
Fri |
After
16:00 |
|
Legeros observes:
·
E4, E5, E11,
E16, E19, L3, L4, L129, B2, C20, C420, Safety Officer, Car 5, Asst.
Fire Marshals x3 on scene
·
Command post,
media area same as morning, Jones at Dawson, SW corner, youth center
parking lot.
·
No more
aerial streams into Metropolitan site.
·
E3 at Jones
and West, connected to hydrant.
·
EMS 34, EMS 8
on scene.
·
Investigators
on scene: RFD, SBI, ATF.
·
FFs have been
breaking/clearing remaining window glass from front of Quorum
Center.
·
Panels of
wooden have been used during the day, on the ground, to cover the
hose from any glass fragments.
·
Construction
crews removing segments of construction crane from Harrington Street
building roof. |
Sat |
0800 |
Tent
operations begin. |
R1, L3
deploy a mobile shelter from Task Force 4 cache, for housing canteen
services at command post, for crews on scene. |
Sat |
0800-1300 |
First
shift of companies assigned to scene, until 13:00.
|
Lunch
provided. Several engines providing manpower, plus Bat 3 in command. |
Sat |
|
Firefighters assist residents with removing belongs from the Quorum
Center and Links Apartments.
|
One
firefighter escorts each resident, or pair of residents, into their
building. Though the Quorum has power, the Link has no lights nor
elevator service.
Residents are shuttled to their buildings from the Municipal
Building, via fire department passenger van. They wait at staging
areas at each building. |
Sat |
After
10:00 |
|
Legeros observes:
·
Three engines
staged at Harrington/Edenton.
·
Six engines
staged on West south of Jones.
·
EMS 1 on
scene.
·
RFD escorting
residents with one FF per resident or pair of residents to their
unit, to retrieve property.
·
Utility crews
replacing broken power lines on Harrington at Jones.
·
Public works
clearing broken glass on Jones at Harrington. |
Sat |
13:00-17:00 |
Second shift of companies begins
operations. |
·
Planned: E2,
E6, E20, E22, E26, E29, B3
·
Tac 25
·
Report to
command post, Harrington and Jones. |
Sat |
15:00
about |
First ATF national response team
members begin arriving. |
·
Commercial
bus deployed, mobile HQ.
·
From
Washington, DC. |
Sat |
17:00 |
Investigation team conducts afternoon
daily briefing. |
|
Sat |
After
17:00 |
|
Legeros observes:
·
RFD recruits
leaving scene, nine or so. Transported by RFD bus.
·
C1 also on
scene.
·
Public works
street sweeper, cleaning remaining debris at Jones and Harrington.
·
Remaining
fire units leave scene by/after 6:00 p.m. |
Sat |
17:00 until
???? |
Third and last shift of operations
begins operations. |
·
Planned: E4,
E8, E10, E11, E16, E24, B4
·
Dinner
provided.
·
Tac 25
·
Report to
command post, Harrington and Jones.
·
Was this third
shift utilized? |
Sun |
After 08:00 |
Firefighters assist residents with removing belongings from the
Quorum Center and Links Apartments. Residents are shuttled from the
Municipal Building, via fire department passenger van. |
|
Sun |
Need time |
ATF equipment truck arrives from
Charlotte. |
|
Sun |
Need time |
EOC deactivated |
|
Sun |
17:00 |
Investigation team conducts briefing
of all local/state/federal investigators at Station 1 |
By that time, about 90 percent of the
national response team has arrived. |
Next Week |
|
City Public Affairs office takes over
as point of contact for all fire department questions and inquiries. |
|
|
|
Fire
investigation team conducts work, both on- and off-site.
|
Daylight operations only. Each day begins with 0800 hours meeting
and briefing of their team. Each day ends with a second meeting and
briefing at 17:00 hours. They utilize an office in the Dillon
Building on West Martin Street, across the hall from Fire
Administration offices. |
Mon |
|
|
08:00 – Investigation team holds
morning briefing.
17:00 - Investigation team holds
afternoon briefing. |
Tues |
|
|
08:00 – Investigation team holds
morning briefing.
17:00 - Investigation team holds
afternoon briefing. |
Weds |
|
|
08:00 – Investigation team holds
morning briefing.
17:00 - Investigation team holds
afternoon briefing. |
Thur |
|
|
08:00 – Investigation team holds
morning briefing.
17:00 - Investigation team holds
afternoon briefing. |
Fri |
|
|
08:00 – Investigation team holds
morning briefing.
17:00 – ATF demobilizes |
Sat |
|
|
|
Etc. |
|
|
|
Copyright 2023 by Michael J. Legeros